What is the CISM exam?

Certified Information Security Manager (CISM) is an ISACA certification for people who manage information security: assessing risk, setting up governance and responding to incidents. The exam has 150 multiple-choice questions in four hours, and you pass with a scaled score of 450 or higher.

The outline changed for exams from November 3, 2026, so check that your study materials are current before you rely on them. The free CISM practice test on this page has 20 newly written practice questions, spread roughly by the official domain weights. They are not real exam questions.

CISM certification requirements: can you take the exam first?

Yes. You can sit the exam first, but passing does not make you certified. To certify, you need:

  • Five or more years of information security management work, across at least three of the four domains
  • That experience gained within the 10 years before you apply
  • A supervisor or manager to verify it
  • An application within five years of passing

ISACA's candidate guide allows experience waivers of up to two years, but the ISACA pages cited here do not list what qualifies, so check with ISACA. If you are short of the five years, plan your exam date around that five-year application window.

CISM exam format and passing score

Item Official detail
Questions 150 multiple choice, including unscored pretest items (ISACA does not say how many)
Time 4 hours, which works out to 1.6 minutes per question
Delivery PSI test center or remote proctoring, with continuous registration
Booking From 48 hours after payment, up to 90 days ahead, within a six-month eligibility period
Exam fee US$575 for ISACA members, US$760 for nonmembers
Score Scaled 200 to 800, with 450 or higher to pass
Wrong answers No penalty, so answer every question
Results Preliminary on screen, official within ten working days, domain-level results for information only, no question-level results
Retakes Four attempts in a rolling 12 months, full fee each time

Two rules should shape how you prepare. First, your score depends on the total number of items you get right, whichever domain they come from. The domain percentages show how much content each area takes up, but they are not used to calculate your score. The guide describes no separate pass mark for each domain, so a strong area can offset a weak one, and weakness in a large domain costs the most.

Second, retakes are slow. You wait 30 days after a first attempt, then 90, then 90, so a fourth attempt can come no sooner than 210 days after the first.

What does the CISM exam cover in 2026?

The same four domains remain. ISACA says the update puts more emphasis on strategy and program development, and adds two content areas: enterprise architecture and information security architecture.

Domain Weight What it covers Decision you should be able to make
1. Information Security Governance 18% Culture, legal duties, roles, strategy, enterprise architecture, budgets Who is accountable, and does this plan serve the business?
2. Information Security Risk Management 20% Emerging threats, control gaps, risk analysis, treatment, ownership, reporting How serious is this for us, and who decides the response?
3. Information Security Program 33% Security architecture, policies, classification, control design and testing, training, suppliers, metrics Which control or measure fits, and is it working?
4. Incident Management 29% Response plans, business impact analysis (BIA), business continuity plan (BCP), disaster recovery plan (DRP), testing, containment, communications, recovery, post-incident review What happens first, and who must be told?

The new architecture items sit in two places. Enterprise architecture falls under strategy in Domain 1, so think about how security shapes the company's target design. Information security architecture falls under program development in Domain 3, where that design turns into requirements for systems. NIST describes the second as a sub-architecture derived from the first, which is a handy way to tell them apart. ISACA's outline lists both areas without defining them, so treat NIST's wording as a study aid.

How to split your CISM study time

Start from the weights, because they are the only official guide to how the exam is divided. On a 100-hour plan (the number is only an example), a first draft looks like this:

  • Information Security Program: 33 hours
  • Incident Management: 29 hours
  • Information Security Risk Management: 20 hours
  • Information Security Governance: 18 hours

Then adjust it. Take a timed practice set, compare your results by domain, and move hours toward the areas where you lose the most points relative to their weight. A security engineer may need more time on governance and budgets. A compliance lead may need more on incident containment and recovery. Program and Incident Management together make up 62% of the exam, so don't cut them far below their share, even if they feel familiar.

Save the last stretch for pace. At 1.6 minutes per question, a long scenario can cost you time, so practice some sets under the clock.

ISACA updated its preparation materials on September 1, 2026, and strongly recommends them for exams from November 3, so check that any CISM study guide covers the new outline before you buy it.

How to use a CISM practice test

ISACA's guide warns that a question may turn on a qualifier such as MOST likely or BEST. Several answers can be sound actions, so ask three things before you choose. Who owns this decision? What does the business need here? What should happen before anything else?

Watch for good actions proposed by the wrong person or at the wrong time. An engineer may be right to patch, for example, while the manager's first job is to establish the risk and take it to whoever can accept it.

When you review a miss, ask whether your choice came too early or sat with the wrong role, then log which domain it belongs to. After the free set, VirtuePrep has 720 CISM practice questions, with an explanation for every answer. They cannot predict your result, and no score on them guarantees a pass. You can compare other certifications on the exams page.

What does it take to keep CISM?

You need at least 20 hours of continuing professional education (CPE) a year and 120 over three years, plus a yearly fee of US$45 for members or US$85 for nonmembers. From January 1, 2027, at least 90 of the 120 must align with the certification's outline, up to 30 can be professional development, and vendor sales or marketing demos no longer count.

20 free CISM practice questions

Answer each one yourself, then open the answer. No account needed. These are study questions, not real exam questions.

  1. A retailer's executive team has approved a prepaid health-benefit card, which brings the company under sector rules that have never applied to it. Launch is three months away. What should the information security manager do FIRST?

    1. Run a penetration test of the card platform against the current security baseline
    2. Work with legal counsel to determine the new obligations and their effect on controls
    3. Extend the existing payment card controls to the new product and adjust them after launch
    4. Ask the platform vendor to confirm in writing that its product meets the sector rules
    Show answer

    Answer: B. The manager cannot judge whether controls are adequate until the company knows what the new rules require of it. Those legal, regulatory and contractual duties have to be understood first, then managed through policy and controls. Testing and vendor assurances can come later, once there are known requirements to measure them against.

    Source: NIST Cybersecurity Framework 2.0, GV.OC-03

  2. At a logistics company, business units expect the security team to decide which policy exceptions are acceptable, and the security team expects the business units to decide. Requests sit unresolved for weeks. What should the information security manager propose to senior leadership?

    1. Moving approval of all exceptions to the security team so that every decision stays consistent
    2. Asking internal audit to rule on each disputed exception as an independent party
    3. Rejecting any exception older than 30 days until the backlog has cleared
    4. Defining who holds approval authority at each risk level, with business leaders accountable
    Show answer

    Answer: D. The delay comes from unclear authority, so the fix is a governance decision made by leadership. Accountability for cybersecurity risk rests with organizational leadership, and roles and authorities need to be established and communicated. Once approval levels are set, the security team can advise while the accountable leaders decide.

    Source: NIST Cybersecurity Framework 2.0, GV.RR-01 and GV.RR-02

  3. A security manager's three-year strategy lists a new log analysis platform, an identity platform and a data loss prevention rollout. The executive committee says it cannot see why these should be funded ahead of other projects. How should the manager BEST rework the strategy?

    1. Show how each initiative supports a business objective and lowers a risk beyond tolerance
    2. Add technical detail so the committee can see exactly which control gap each tool will close
    3. Include peer benchmarks showing where the company trails others in its sector
    4. Cite average breach costs in the sector to show the price of not funding them
    Show answer

    Answer: A. Executives compare security spending with other uses of the same money, so the case has to rest on business objectives and agreed risk limits. The organization's mission should inform cybersecurity risk management, and risk appetite and tolerance statements give a shared basis for comparison. A strategy framed this way lets the committee weigh the initiatives as business decisions.

    Source: NIST Cybersecurity Framework 2.0, GV.OC-01 and GV.RM-02

  4. An insurer's enterprise architecture group is defining a target state that retires four claims platforms in favor of one shared cloud service. Security normally reviews each project shortly before go-live and has not been involved so far. What should the information security manager do?

    1. Wait for the first project design review, when there will be concrete details to assess
    2. Publish a separate security architecture that all claims project teams must also follow
    3. Join the architecture work now so security requirements shape the design
    4. Ask the group to retain the current security tools so that coverage does not lapse
    Show answer

    Answer: C. Target-state decisions shape what later projects can build, so requirements raised at go-live arrive after the main choices are made. NIST SP 800-39 treats information security architecture as part of the enterprise architecture, derived from it and not defined as a separate layer. Early involvement also gives security and the business a common view of risk across the consolidation.

    Source: NIST SP 800-39, sections 2.2 and 2.4.2

  5. Three business units are each piloting the same AI assistant connected to company data. Each unit has finished its assessment, rated the risk moderate and within its own tolerance, and logged it in its own register. A flaw or vendor failure would hit all three at once. What should the information security manager do?

    1. Combine the entries and report the total exposure for an enterprise-level decision
    2. Leave the entries as logged, because each rating falls within that unit's tolerance
    3. Average the three ratings and record the result as the company's rating for the assistant
    4. Move all three entries under the security team so that one group owns and treats the risk
    Show answer

    Answer: A. Each rating describes one unit, so none of them shows what happens when all three are hit together. NIST SP 800-30 explains that when several risks materialize concurrently, the overall impact can go beyond what was assessed for each one. NIST IR 8286 has lower-level registers aggregated, normalized and prioritized at higher levels, so enterprise leaders can see the exposure and decide on a response. The manager's part here is to make the combined risk visible to those leaders.

    Source: NIST SP 800-30 Rev. 1, section 2.3.1, Aggregation

  6. A monthly report shows a critical-rated flaw on a stand-alone lab server with no network connection or business data, and a medium-rated flaw on the internet-facing customer payment portal that attackers are reportedly exploiting in the sector. Only one change window remains this month. Which flaw should the information security manager prioritize?

    1. The lab server flaw, because the severity rating sets the order of remediation
    2. The portal flaw, because its likelihood and business impact make the risk higher
    3. The lab server flaw, because fixing it now would cause less disruption to customers
    4. The portal flaw, because customer-facing systems take priority over internal ones
    Show answer

    Answer: B. A severity rating describes the flaw, while risk also depends on the likelihood of exploitation and the impact on the business. NIST SP 800-30 gives a stand-alone system with no external connectivity as an example of a condition that lowers exposure to network attack. The portal handles customer payments, is reachable from the internet and faces reported exploitation. That risk reasoning decides the order here, since no fixed rule puts customer-facing systems first in every case.

    Source: NIST SP 800-30 Rev. 1, section 2.3.1

  7. A legacy application cannot meet the encryption standard until it is replaced in 18 months, and the assessed residual risk is above the stated tolerance. An IT project manager, whose budget would fund interim controls, emails the security manager saying, "We accept the risk." What should the security manager do?

    1. Accept the risk on the company's behalf until the replacement goes live
    2. Record the acceptance in the risk register, since the project budget is affected
    3. Take the risk and the options to the designated risk owner and record that decision
    4. Reject the acceptance and require interim controls, since the risk exceeds tolerance
    Show answer

    Answer: C. Holding the budget for a fix does not make someone the owner of the risk. NIST IR 8286 describes the risk owner as the party responsible and accountable for keeping the risk within enterprise requirements, and it has that owner evaluate whether residual risk beyond the acceptable level can be brought back within it. The security manager's job is to present the exposure, options and costs, then make sure the owner's decision is recorded.

    Source: NIST IR 8286 Rev. 1, Table 1 and section 3.5.2

  8. After a ransomware attack at a competitor, the CFO proposes buying a larger cyber insurance policy and cutting planned spending on network segmentation, saying this takes the risk off the company's books. What is the information security manager's BEST response?

    1. Explain that insurance may offset financial loss, but harm such as lost trust remains
    2. Support the proposal, because transferring a risk also transfers accountability for it
    3. Oppose the policy, because insurers will not pay unless segmentation is complete
    4. Support the proposal, once the policy limit covers the largest estimated loss
    Show answer

    Answer: A. Transfer shares part of the consequences with another party. NIST IR 8286 notes that some financial consequences may transfer while others, such as loss of customer trust, often do not. The manager can then help the CFO compare the residual risk of each mix of insurance and segmentation against tolerance.

    Source: NIST IR 8286 Rev. 1, Table 2

  9. After several acquisitions, each division runs its own identity, logging and network protection tools. Projects choose controls one at a time, and gaps surface only at pre-launch review. What should the information security manager develop to address the underlying cause?

    1. A review board that looks more closely at each project's controls before launch
    2. A single-vendor purchase for each control area across all of the acquired divisions
    3. A stricter policy directing divisions to close any gaps within 30 days
    4. A security architecture that allocates business-driven requirements to systems
    Show answer

    Answer: D. The problem is the absence of a shared design, so more review or pressure at the end of each project would leave the cause in place. NIST SP 800-39 describes the information security architecture as a roadmap for defining protection needs from business processes and allocating them to systems and their environments. Tool consolidation can follow if that design supports it.

    Source: NIST SP 800-39, section 2.4

  10. A manufacturer's new data platform will hold public product sheets, supplier pricing covered by confidentiality agreements, and production data whose alteration could halt a plant. The data owners have completed their impact ratings, and all three data types will stay on the platform. How should the information security manager set the platform's protection baseline?

    1. Use an average of the owners' ratings, weighted by the volume of each data type
    2. Use the highest rating for each security objective across the data it holds
    3. Use the rating of the data type that the largest number of users will access
    4. Use the supplier pricing rating, because that data carries contractual duties
    Show answer

    Answer: B. A system holding several types of information takes the highest impact value for each of confidentiality, integrity and availability, which FIPS 199 calls the high water mark. Here, the production data would likely set the integrity rating and the supplier pricing would likely set the confidentiality rating. FIPS 199 is a US federal standard, but the reasoning carries over to a company's own classification scheme.

    Source: FIPS 199, Security Categorization Applied to Information Systems

  11. The board's risk committee wants to know each quarter whether the security program is helping the company meet its service resilience goals. The current report counts blocked attacks, patches applied and training completions. What should the information security manager change?

    1. Add more technical counts so that the committee can follow longer trends
    2. Give the committee direct access to the live security monitoring dashboards
    3. Add measures showing how well controls work and what that means for the business
    4. Add a comparison of the security budget with published industry spending averages
    Show answer

    Answer: C. Counts of activity show that work happened, but the committee asked whether a business goal is being met. NIST SP 800-55 separates implementation measures from effectiveness and impact measures, and it notes that impact measures are the kind executives look for. Choose measures to fit the goal and the audience, then explain them in non-technical terms.

    Source: NIST SP 800-55 Vol. 1, section 3.3

  12. A privileged access tool went live six months ago, and every administrator account is enrolled. A control test now finds administrators using shared emergency accounts for daily work, because the tool's approval step delays night-shift fixes. The tool's owner wants to disable the emergency accounts today. What is the BEST next step for the information security manager?

    1. Work with the owner to fix the approval delay and put oversight on emergency use
    2. Disable the emergency accounts today and handle urgent access requests case by case
    3. Commission a second tool to watch the shared accounts and leave daily practice as is
    4. Record an accepted exception and look at it again in the next annual control test
    Show answer

    Answer: A. NIST SP 800-53A measures control effectiveness by whether a control is implemented correctly, operates as intended and produces the desired outcome, and this test shows the tool is not operating as intended. The bypass has a cause, so closing the route alone could lead to a new workaround or block urgent recovery work during an outage. Fixing the delay with the control's owner, while keeping a supervised emergency route, deals with the cause and keeps recovery possible. Treating this as the first step is a management judgment, because the source does not set an order.

    Source: NIST SP 800-53A Rev. 5, chapter 1

  13. A company's annual awareness course has 99% completion, yet the rate of staff reporting simulated phishing messages has been flat for two years and phishing remains the leading entry point in its incident records. HR suggests raising the completion target to 100%. What should the information security manager do?

    1. Accept the 100% target and keep the course content as it stands
    2. Lengthen the course and add a final test to confirm that staff retain it
    3. Introduce disciplinary action for anyone who fails a phishing simulation
    4. Refocus learning on the behaviors driving the risk, and track those behaviors
    Show answer

    Answer: D. Completion shows who took the course, while the incident records show that the risk has not moved. NIST SP 800-50 advises using data to identify the behaviors that affect risk and measuring them as part of tracking culture, and it reports that organizations often used a limited number of metrics that left an incomplete view of effectiveness. Role-based content can then go to the groups the data points to.

    Source: NIST SP 800-50 Rev. 1, sections 1.1 and 2.4

  14. A hosted payroll provider passed the company's security assessment 14 months ago. It now gives notice, as its contract requires, that next quarter a subcontractor in another country will process the company's data. What should the information security manager do FIRST?

    1. Rely on the provider's statement that its own review of the subcontractor was satisfactory
    2. Reassess the change with the business owner and legal, including subcontractor terms
    3. Schedule the subcontractor for the next annual assessment, since notice has been given
    4. Begin ending the contract, since data would leave the assessed environment
    Show answer

    Answer: B. A supplier's structural change can alter exposure after the contract is signed, so the earlier assessment no longer describes the current risk. NIST SP 800-161 tells enterprises to monitor for such changes and to extend relevant requirements to sub-tier contractors. Legal input matters because moving data to another country can bring new obligations, and the business owner owns the service and the decision.

    Source: NIST SP 800-161 Rev. 1, sections 1.4.3 and 3.1.2

  15. A business impact analysis sets a maximum tolerable downtime of 12 hours for order fulfillment. In a recovery test, the order system was restored in 10 hours, and staff then needed 4 more hours to reprocess queued transactions. The recovery team reports that its target was met. What should the information security manager conclude?

    1. The target was met, and the remaining time is a matter for the process owner alone
    2. The test was invalid, because reprocessing belongs to a different plan from recovery
    3. The maximum tolerable downtime should rise to 14 hours to match the test result
    4. The process recovered too late, so the gap and the options go to the process owner
    Show answer

    Answer: D. The business process was back after 14 hours, two hours beyond what the impact analysis allowed. NIST SP 800-34 explains that reprocessing time has to be added to the recovery time objective to stay inside the maximum tolerable downtime, so the objective normally needs to be shorter. The limit reflects what the business can bear, so closing the gap is a decision about options and cost, not a reason to restate the number.

    Source: NIST SP 800-34 Rev. 1, section 3.2.1

  16. Security analysts work tickets in the order they arrive. Last week a malware case on a lobby kiosk occupied them for a day while a report of suspicious access to the customer database waited in the queue. What should the information security manager do to prevent a repeat?

    1. Establish severity criteria using factors such as asset criticality and data impact
    2. Add analysts to each shift so that the queue clears faster at busy times
    3. Require analysts to send every new report to the manager for a priority decision first
    4. Sort the queue by the alert score assigned by the detection tool
    Show answer

    Answer: A. NIST SP 800-61 advises against first-come, first-served handling because resources are limited, and it bases triage and prioritization on risk evaluation factors. Its examples include asset criticality, functional impact, data impact and recoverability. Written criteria let analysts make consistent decisions without waiting for the manager.

    Source: NIST SP 800-61 Rev. 3, Table 3, RS.MA and RS.MA-03

  17. A company has just approved a new incident response plan naming legal, communications, business owners and technical leads, and these people have never worked an incident together. The CEO wants a live attack simulation on production next month to prove readiness. What should the information security manager recommend as the BEST next step?

    1. Going ahead with the live simulation, since realistic pressure shows gaps fastest
    2. Sending the plan to each named role and collecting a signed acknowledgment
    3. Holding a tabletop exercise on roles, coordination and decisions
    4. Running a restore test with IT, since technical teams carry most of the response
    Show answer

    Answer: C. The main unknown is whether this group can coordinate and make decisions together, and a tabletop exercise is a discussion-based format built to examine exactly that. It involves no deployed equipment, so production is not at risk, and it can expose misunderstandings in the plan. More demanding exercises can follow once the roles are understood.

    Source: NIST SP 800-34 Rev. 1, section 3.5.3

  18. Analysts confirm ransomware on a distribution company's file server, with signs that it is spreading to other hosts. The operations VP asks that the server stay online for nine more hours until the day's shipping ends. The incident policy gives the incident lead authority to disconnect systems. What should the information security manager support?

    1. Keeping the server online under closer monitoring until the shipping day ends
    2. Holding all action until the CEO has ruled between the two positions
    3. Restoring backups to a clean server while the infected server stays on the network
    4. Isolating the affected systems now and planning shipping workarounds with the VP
    Show answer

    Answer: D. Containment exists to stop an incident from expanding, and active spread makes delay costly. A policy that says who may disconnect systems means this decision does not have to wait for a debate during the incident. Asset owners still have useful input on recovery priorities and need status updates, so the VP stays involved in limiting the business impact.

    Source: NIST SP 800-61 Rev. 3, sections 2.2 and 2.3, and RS.MI-01

  19. A US public company subject to SEC disclosure rules is three days into an incident. Evidence shows customer data was stolen, but the cost is unclear. The response team wants to finish forensics before informing anyone outside the team, because its figures are incomplete. What should the information security manager do?

    1. Wait for the final forensic report so that any later decision rests on complete figures
    2. Brief legal and those who make the materiality decision now, with known facts and gaps
    3. Decide materiality using the team's severity rating, then send the result to legal
    4. Ask public relations to issue a statement now, ahead of any materiality decision
    Show answer

    Answer: B. SEC Form 8-K says the materiality determination must be made without unreasonable delay after discovery, and the filing is generally due four business days after it. The people making that determination need the facts early, including what is still unknown, and the form lets a filing state what is not yet determined and be amended later. The security manager supplies the information and follows the plan's notification procedures. This scenario applies only to SEC registrants, and the question is exam study material, not legal advice.

    Source: US SEC Form 8-K, Item 1.05 and its Instructions

  20. Recovery from a major account takeover incident is nearly complete. The incident lead suggests skipping the review meeting because the team is tired and the root cause is already known. What should the information security manager do?

    1. Accept a written root cause note from the lead and close the incident file
    2. Combine the lessons into the annual plan revision to save the team's time
    3. Hold a review with all parties involved and assign owners to the improvements
    4. Limit the meeting to technical responders so that the discussion stays focused
    Show answer

    Answer: C. Knowing the root cause answers only part of what a review is for. NIST SP 800-61 describes these meetings as a chance to look at what happened, what was done and how well it worked, while hearing from everyone involved. For a major incident, that can improve the response program and wider risk management, and assigned owners keep the agreed changes from being lost.

    Source: NIST SP 800-61 Rev. 3, Table 2, ID.IM-03

Practise all 720 questions

What you get with VirtuePrep CISM prep

  • 720 practice questions built around the topics the CISM tests.
  • An explanation for every answer, so each mistake teaches you something.
  • Stats and history that show your weakest topics first.
  • Web, iPhone and Android, so you can study wherever you have ten minutes.

CISM practice test questions people ask

What is the pass mark for the CISM exam?
You need a scaled score of 450 or higher on ISACA's 200 to 800 scale. That scale converts your raw score, so 450 is not a percentage, and the ISACA candidate guide gives no percentage equivalent.
How much does CISM cost?
The exam costs US$575 for ISACA members and US$760 for nonmembers, and you pay the full fee for each attempt. After you pass, there is a one-time US$50 application fee, which brings the first-time total to US$625 or US$810 before membership dues and study materials. The ISACA pages cited here show prices in US dollars only.
Is CISM difficult?
The ISACA pages cited here give no difficulty rating, so any answer is partly opinion. What you can plan around is 150 questions in four hours, questions that may turn on words such as BEST, and an outline built around running security rather than configuring it.
How long should I study for CISM?
The ISACA pages cited here recommend no number of hours, and the time you need depends on your experience in each domain. Take a timed practice set first, then build your hours from the official weights and your weak areas.
Is the CISM exam format changing?
The change has already happened. ISACA's September 2026 release dates the updated exam from November 3, 2026, with the same four domains, adjusted weights and two new content areas. The candidate guide still lists 150 multiple-choice questions in four hours.
What is the CISM pass rate?
The ISACA pages cited here do not publish a CISM pass rate, so this page does not give one. Be careful with any figure that has no ISACA source behind it.
CISM vs CISSP, what is the difference?
CISM has four domains centered on managing security. ISC2 lists eight domains for CISSP, including network security, identity and access management, and software development security, and five years of required work experience, the same length CISM asks for. CISM is the closer fit if your work is governance, risk, the security program and incidents, while CISSP covers more technical ground. ISC2 says a new CISSP outline takes effect on April 15, 2027.
CISM vs CISA, which one fits me?
Choose by the job you do or want. CISA has a domain for the auditing process, plus domains on IT governance, systems acquisition, operations and protection of assets. CISM has no audit domain, and 62% of its weight sits in running the security program and handling incidents.

Sources